Floor Media Recovery Systems

WHEN DOWNTIME ISN'T IN YOUR VOCABULARY


Below Grade Full Floor Pneumatic Media Recovery System


INSTALLATION FLEXIBILITY: Can also be installed above grade with VES' Above Grade Blast Booth Kit that includes a ramp, skirting and personnel platform for the crew access door.

  • ENGINEERED FOR UNINTERRUPTED PERFORMANCE

    Superior Orifice Engineering: An advanced media metering orifice design delivers faster and higher recovery static pressure rates compared to competitors—maximum efficiency when production schedules leave no room for delays.


    VES Guarantee – Clog-Free Operation: Our advanced floor sections are Guaranteed Clog-free. Period. No exceptions. No downtime. No excuses.

  • INTELLIGENT PNEUMATIC MEDIA RECOVERY CONTROL

    Programable Precision: Whether you choose our Pneumatic actuated Linear slide gate or our

    Gatling (rotatory) style system, each is programmable via touchscreen control mounted on main control panel—complete system management at your fingertips.


    Our Media Recovery Systems independently sets timing intervals between floor recovery

    sections, providing:

    • Maximum Recovery Effciency: Custom timing for areas of heavy media concentration and the programing to allow longer loitering times where needed most
    • Operator Protection: Dramatically reduces operator exposure to potentially harmful contaminants
  • INDUSTRIAL-STRENGTH FOUNDATION.

    Standard Heavy-Duty Load Capacity: Floor grating designed and manufactured to 2,000

    lbs./sq. ft. standard load rating—engineered to handle your heaviest equipment and most

    demanding operations.


    Integrated Debris Protection: Welded-on wire mesh provides initial screening of large debris,

    preventing contamination from entering the media recovery system and eliminating floor hopper clogging before it starts.


    Modular Design For Maximum Up-Time: Media recovery floor sections manufactured in

    modular design for operational continuity:

    • Individual sections can be removed for repair or replacement
    • Steel plates temporarily installed to keep operations moving
    • Replacement sections delivered while production continues
  • HIGH-PERFORMANCE CONVEYING SUPERIORITY

    VES Advantage: NOT "M" SECTION RECOVERY FLOORS WHICH ARE VERY PRONE

    TO CLOGGING AND EXTENDED DOWN-TIME


    Fundamentally Different: VES media recovery troughs eliminate the critical flaws of inferior

    "M" section recovery floors used by competitors.


    Competitors"M" Section Limitations:

    • Low velocity, low static systems subject to constant plugging
    • High volume conveying air attempts to compensate for design deficiencies
    • Low static pressure unable to "push" plugs or clogs through the system
    • Continuous maintenance and downtime issues

    VES Advanced Solution: High static, high velocity media conveying eliminates plugging problems entirely. VES advanced design media recovery system is not subject to the plugging problems of low static systems and guaranteed clog free.

THE BOTTOM LINE: UNCOMPROMISED RELIABILITY


When every minute of downtime impacts your bottom line and operator safety depends on consistent performance, media recovery system reliability isn't optional—it's essential.


With VES pneumatic media recovery systems, "system clog" becomes a problem your competitors deal with—not you.